Building Renovations
The Project consists of work at three existing facilities as follows: Eddie Washington Center: A. Renovation of an existing 1,500 square foot basement that includes the installation of new partition walls, outlets, and lighting. Mechanical, electrical, and plumbing modifications, including floor slab demolition for under-slab plumbing line installation will be required to accommodate the new space layout. B. Installation of a new foundation drainage system which includes excavation around the building perimeter for installation of a drainage board and weep tile system. C. Renovation of an existing shower room on the main level which includes the installation of new toilet partitions, plumbing fixtures and lighting. D. Replacement of the existing asphalt shingle roof. Patricia A. Jones Center: A. Interior renovations, including flooring and ceiling replacement. B. Extension of an exterior paved patio. C. Replacement of the existing single ply membrane roofing system. Staben House: A. Renovation four (4) existing toilet rooms, including the installation of new wall and floor finishes, and toilet fixtures. B. Replacement of the existing asphalt shingle roof.
Your RSVP has been recorded. Thank you.
Last Updated: 2022-05-23 14:42:18
Project Details
Owner | Get Access Today! |
Project # | Get Access Today! |
Reference # | 0509220922 |
Bid Date | Get Access Today! |
Addenda Date | Get Access Today! |
Pre-Bid Date | Get Access Today! |
Plan/Spec Posted Date | Get Access Today! |
Plan/Spec Availability | Get Access Today! |
Official Bid Documents and Addenda | Get Access Today! |
Location
County | Lake |
City | Waukegan |
State | IL |
More Information
Categories | Demolition, Earthwork, Exteriors, General, Interiors, Mechanical/Electrical, Roofing, Water and Sewer |
Class | Building, Renovations |