Water Reclamation Facility Improvements
The Proposed construction consists of lining System 1 Lift Station Screen Chamber, demolition of existing System 1 Lift Station super structure and conversion of existing sub-grade structures into a wet well and valve vault, emptying contents of Anaerobic Lagoon and disposal of them by land application and land fill, replacement of lagoon liner and cover with biogas collection system and stormwater collection system' rehabilitation and replacement of biogas safety equipment in Biogas Building, structural repair to concrete block Biogas Building, replacement of mechanical bar screen and grit washer in Pretreatment Building, addition of new screenings washercompactor, replacement of existing multistage centrifugal blower with new single stage centrifugal blower (turbo blower), modifications to two Aeration Bays including new baffle walls, new DO and ORP probes, reconfiguration of existing air diffusers, a new steel framed metal sided Administration Building connected to existing Laboratory Building, conversion of office into a Water Lab, and other miscellaneous items of work.
Your RSVP has been recorded. Thank you.
Last Updated: 0000-00-00 00:00:00
Project Details
Owner | Get Access Today! |
Project # | Get Access Today! |
Reference # | 0501190707 |
Bid Date | Get Access Today! |
Addenda Date | Get Access Today! |
Pre-Bid Date | Get Access Today! |
Plan/Spec Posted Date | Get Access Today! |
Plan/Spec Availability | Get Access Today! |
Official Bid Documents and Addenda | Get Access Today! |
Location
County | Ogle |
City | Rochelle |
State | IL |
More Information
Categories | Demolition, Mechanical/Electrical, Water and Sewer |
Class | Civil, Utility |